• +91-124-4289848
  • +91-9818430380
  • This email address is being protected from spambots. You need JavaScript enabled to view it.

Slab Designing & Detailing


There are two types of slab designs

  1. Structural design
  2. Casting or layout design

Concrete planners’ offers its services to review the Structural Design of the floor and helps in the implementation of the Layout Design.

This helps in saving time and cost. And since everything is planned to perfection since its inception, it increases the life of the building. Concrete Planners’ knowledgeable and experienced guidance leads you every step of the way and offers solutions to any problem which may occur during the course of construction and ensures

Preconstruction Planning

An integral component of the Floor Slab project is the preconstruction planning process. It involves a discussion and deliberation on construction and quality issues between the principal contractor, main suppliers and the specialist flooring contractor.

Construction Practice

Each floor has a different construction method and joint layout which should be planned beforehand. From building geometry to equipment layout, joint width, levelness across joints and stability of the joint edges and surface regularity are some of the factors that should be considered.

Joints & Detailing

Joints are dependent on the use of the floor and its construction method. They are provided to subdue tensile stresses and breaks. They are highly vulnerable to damage caused by MHE and need to be regularly maintained.

Joint Layout

The main objective of an ideal joint layout plan is to minimize the risk of cracks by aligning the joints with each corner of the fixed construction elements. Slabs should be separated from fixed construction elements and joints should be positioned to minimize the trafficking from MHE and in VNA’s, joints should be positioned to avoid the wheel tracks of MHE.

Post – Construction

After casting the concrete, the new floor should be left uncovered for at least 3 days for it to gain strength and to avoid surface and joint damage. The appearance of a new floor improves with regular, mechanized cleaning. After completion of construction, sampling and compliance testing reports comprising of quality control, surface regularity, operating and maintenance manuals etc should be completed.

Image

Quick Contact

Corporate Office

Concrete Planners Corporate Ofice
Address
524, Udyog Vihar Phase-5 , Haryana , 122016 Gurgaon, India
Social Media

R & D Center

Concrete Planners R & D Center
Address
Plot No. G-172, Industrial Area Karoli , Rajasthan, 301019 Alwar, India
Social Media
Concreteplanners.com .All Rights Reserved